005 |
20240318172333.0 |
008 |
230724s2023 sp eng d |
022 |
|a2013-0953 (online) |
022 |
|a2013-8423 (papel) |
040 |
|bspa |
041 |
0 |aeng |
100 |
1 |aOrue Irasuegui, Aitor |
245 |
10|aDesigning the Process for Implementing Step Three of the Theory of Constraints in a Make-To-Order Environment: Integrating Sales and Operation Planning|hDocumento científico MGEP|cAitor Orue, Aitor Lizarralde, Unai Apaolaza, Itxaso Amorrortu |
260 |
|c2023 |
300 |
|a10 p |
546 |
|aInglés |
653 |
|aArtículo |
653 |
|a2022-2023 |
653 |
|aDirección de operaciones logístico productivas |
653 |
|aDoctorando |
653 |
|aODS 9 Industria, innovación e infraestructura |
700 |
1 |aLizarralde Aiastui, Aitor |
700 |
1 |aApaolaza Pérez de Eulate, Unai |
700 |
1 |aAmorrortu Gervasio, Itxaso |
710 |
2 |aMondragon Goi Eskola Politeknikoa |
773 |
|tJournal of Industrial Engineering and Management. 2023, vol. 16, n. 2, pp. 205-214 |
856 |
|uhttps://hdl.handle.net/20.500.11984/6223|yTestu osorako sarbidea/Acceso al texto completo/Full text access |
856 |
|uhttp://doi.org/10.3926/jiem.5127 |